Quality Procedure of Project Management (ISO 9001:2015)
-
Quality control point in project
-
Inspection item of installation work
-
Response person in Project Management
-
Control of M/C Equipment used
-
Special process declaration (if required)
-
Safety procedure in installation work
-
Qualification of all staffs must be elected base on their high performance and experience in project management skill.
-
Monitoring by Check sheet included detail of inspection, finding, report to construction management at least one month.
-
Analyze risks and opportunities before starting work to determine how to eliminate them
Preparation for Construction
QP-ENG-01
Construction Project Preparation and Installation
QP-MEP-01
Project Schedule and Report
QP-MEP-03
Project Budget Preparation and Control
QP-ADM-01
Tools and Equipment Movement
QP-PUR-01
Supplier/Sub-Contractor Selection and Assessment
Construction
QP-DWG-01
Shop Drawing, As built Drawing Preparation
QP-ENG-02
Design, Equipment Approval and Amendment
QP-ENG-03
Product Control Delivered by Customer
QP-ENG-04
Change operation agreement
QP-ENG-05
Nonconforming Products Control
QP-ENG-06
Corrective Action and Prevention
QP-EVC-01
Construction Work Control
QP-EVC-02
Construction Project Budget Preparation and Control
QP-EVC-03
Equipment Calibration and Testing Preparation
QP-EVC-04
Construction Work Testing and Inspection
QP-MEP-02
Work Installation Control
QP-MEP-04
Inspection and Testing
QP-MEP-05
Inspection and Testing Status
QP-SEV-02
Inspection, Measurement and Equipment Testing Control
QP-WHC-01
Tools and Equipment Maintenance and Control
QP-WHC-02
Tools and Equipment Maintenance and Control Incoming and Outgoing
QP-WHC-03
Tools/Equipment And Maintenance Tools/Equipment Traceability and Identification
Work Delivery & Guarantee
QP-ECV-05
Construction Project Completion Control
QP-ENG-06
Corrective Action and Prevention
Break Down Structure
©
Analyze Critical Path of Work to set Master Schedule
©
Focus on Critical Work in Master Schedule
©
Prepare on related manpower/equipment in man-day, Quantity suitably to each Critical Work
©
Project monitoring every week to catch up working Schedule, property revise master schedule to appropriate work load
Management lead time
of purchase Material / equipment that will affect to project schedule by expedition log that our Engineer will follow up on every material/equipment delivery on time property
Co-ordinate with other-Trade
for internal meeting to review over all progress of work
To conclude to find solution
for Trouble/ problem that will affect to Project Schedule
Adjust / revise sequence of work
conform to Master schedule of project owner
Project Insurance
to prevent risk that will occurs
Monitoring by
©
Progress of work (Daily Report)
©
Weekly Report to conclude progress of work that achieves in each week compare with master schedule
©
Catch up by revise weekly plan in critical path in manpower/equipment Resources Need in each system property by maintain consistent mile-stone in Master Schedule